When entering the assembly of a wall constructed using OSB and spruce I beams for vertical wall studs with insulation between the studs can you make a composite wall assembly in WUFI Pro 7.1?
If so what % of thickness would you use for the stud in the insulation build up?
Or
Is it better to run two cases, one for the stud and one for the insulation between to analyse them in isolation
Thank you

