Hi all,
I am working on a 10-story Mixed Use Building with a street level commercial/retail space and 81-studio dwelling units on the 9-floors above street level. There is a small basement below grade that will house the MEP services. My approach is to model the nine floors residential portion as ...
Search found 2 matches
- Wed Apr 20, 2022 4:37 am -1100
- Forum: WUFI Passive
- Topic: Mixed-use Project Energy Protocol
- Replies: 0
- Views: 36400
- Wed Apr 20, 2022 3:58 am -1100
- Forum: WUFI Passive
- Topic: Metal Stud Wall Assembly
- Replies: 0
- Views: 37053
Metal Stud Wall Assembly
Hi all,
While designing a metal stud wall with cavity insulation in WUFI Passive, do we use the nominal R-value of insulation or R-eff to account for the framing?
It is a 2 x 6 metal stud wall with mineral wool C.I. and R-21 Armor wall on the exterior.
Thank you,
Anushka
While designing a metal stud wall with cavity insulation in WUFI Passive, do we use the nominal R-value of insulation or R-eff to account for the framing?
It is a 2 x 6 metal stud wall with mineral wool C.I. and R-21 Armor wall on the exterior.
Thank you,
Anushka